Workshop Manuals Factory service & repair Land Rover
01 Range Rover 2002MY ON Workshop Manual - Service Procedures - LM - 6th Edition - NAS02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 INTRODUCTION26 27 28 GENERAL INFORMATION29 30 31 GENERAL DATA32 33 IDENTIFICATION NUMBERS34 35 TORQUE WRENCH SETTINGS36 37 LIFTING AND TOWING38 39 CAPACITIES, FLUIDS, LUBRICANTS AND SEALANTS40 MAINTENANCE41 42 ENGINE - V843 44 45 46 EMISSION CONTROL - V847 ENGINE MANAGEMENT SYSTEM - V848 49 FUEL DELIVERY SYSTEM - V850 51 COOLING SYSTEM - V852 53 54 55 MANIFOLD AND EXHAUST SYSTEM - V856 57 58 TRANSFER BOX59 60 61 AUTOMATIC TRANSMISSION - ZF 5HP2462 63 DRIVESHAFTS64 65 FINAL DRIVE66 67 68 FRONT DIFFERENTIAL69 70 71 72 STEERING73 FRONT SUSPENSION74 75 REAR SUSPENSION76 77 BRAKES78 RESTRAINT SYSTEMS79 80 81 82 DOORS83 EXTERIOR FITTINGS84 85 INTERIOR FITTINGS86 87 88 SCREENS89 90 91 SEATS92 93 94 SUNROOF95 BODY DIMENSIONS96 97 98 99 PANEL REPAIRS100 101 102 103 BODY SEALING MATERIALS104 105 106 107 CORROSION PREVENTION AND SEALING108 109 PAINTING110 111 HEATING AND VENTILATION112 AIR CONDITIONING113 114 115 WIPERS AND WASHERS116 CHARGING AND STARTING117 118 119 LIGHTING120 CONTROL UNITS AND RELAYS121 122 DRIVING AIDS123 124 ALARM SYSTEM AND HORN125 126 WINDOWS127 128 NAVIGATION AND IN CAR ENTERTAINMENT129 HARNESSES130 131 INSTRUMENTS
Land Rover L322 Range Rover Service Procedures42 · ENGINE - V8
42 · Engine

Pipe(s) - water pump to coolant manifold

Make
Land Rover
Model
Range Rover L322 Range Rover Service Procedures
Section
OVERHAUL › Pipe(s) - water pump to coolant manifold
ENGINE - V8Pipe(s) - water pump to coolant manifold
background image

ENGINE - V8

12-2-114 OVERHAUL

Reassembly

1. Fit and lubricate new restrictor, seal and 'O' ring 

to centre timing chain guide.

2. Position centre timing chain guide and secure 

with Torx bolts, tighten to 10 Nm (7 lbf.ft). 

3. Fit and lubricate 'O' ring to RH timing chain 

tensioner guide.

4. Fit RH timing chain tensioner guide and secure 

with Torx bolt tighten to 45 Nm (33 lbf.ft).

5. Fit LH timing chain guide and secure retaining 

clip.

6. Fit bolt to secure LH timing chain guide and 

tighten to 10 Nm (7 lbf.ft). 

7. Lubricate timing chain with clean engine oil.
8. Fit timing chain to crankshaft sprocket and RH 

VCC unit.

NOTE: The timing chain may be fitted in any 
position to the crankshaft sprocket and RH 
VCC unit sprocket.

9. Secure timing chain to LH cylinder head until 

LH VCC unit is fitted.

Refit

1. Fit lower timing gear cover.

 

 + 

 Engine - V8, OVERHAUL, Cover - 

timing gear - lower.

2. Fit LH VCC unit.

 

 + 

 Engine - V8, OVERHAUL, Variable 

camshaft unit - variable camshaft control 
(VCC).

Pipe(s) - water pump to coolant manifold 

$% 26.31.25.01

Remove

1. Remove induction manifold.

 

 + 

 Engine - V8, OVERHAUL, Gasket(s) 

- induction manifold.

Disassembly

1. Remove 6 bolts securing coolant manifold to 

cylinder heads.

2. Remove coolant manifold.
3. Remove and discard coolant manifold gaskets.

4. Remove 2 coolant pipes from coolant pump.
5. Discard 'O' rings.

Inspect

1. Clean gasket mating faces.
2. Clean 'O' ring grooves and ends of coolant 

pipes.

Parts & tools for this job Staging For Land Rover Range Rover

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.