Workshop Manuals Factory service & repair Lancia
01 General information02 Specifications03 Manufacturing data and tolerances04 Tightening torques05 Fluids and lubricants06 Maintenance07 Diagnostic checks08 Engine09 Clutch10 Gearbox and differential11 Axles and driveshafts12 Brakes13 Steering14 Suspension and wheels15 Heating, air conditioning and auxiliary units16 Electrical equipment17 Body fittings18 Body panels and frame19 Wiring diagrams and electrical functions20 Wiring harnesses21 Connectors and pin-outs22 Fault diagnosis23 Service news bulletins24 Special tools
Lancia Thesis Factory Service Manual (2002-2009)08 · Engine
08 · Engine

Pneumatically controlled throttle casing - r.r.

Make
Lancia
Model
Thesis Factory Service Manual
Year
2002–2009
Section
Diesel fuel injection system › Pneumatically controlled throttle casing - r.r.
EnginePneumatically controlled throttle casing - r.r.

PNEUMATICALLY CONTROLLED THROTTLE CASING - R.R.

Operation 1060G50 · DIESEL INJECTION PRESSURE PUMP ELECTRONIC CONTROL

2.4 JTD 20V

Removing

See in Op. 7040D50 ENGINE COMPARTMENT UPPER SOUND INSULATION SHIELD - R.R.

See in Op. 1016A10 SOUND-PROOFING COVER - R.R.

See in Op. 1048B44 RIGID air supply PIPE from heat exchanger to intake manifold - R.R.

- Disconnect the vacuum pipe from the vacuum unit.

1. Undo the bolts fixing the throttle casing to the intake manifold.

2. Remove pneumatically controlled throttle casing

PNEUMATICALLY CONTROLLED THROTTLE CASING - R.R.

Refitting

- Fit the throttle casing on the intake manifold.

- Tighten the bolts fixing the throttle casing to the intake manifold.

- Connect the vacuum pipe to the connector on the vacuum unit.

See in Op. 1048B44 RIGID air supply PIPE from heat exchanger to intake manifold - R.R.

See in Op. 1016A10 SOUND-PROOFING COVER - R.R.

See in Op. 7040D50 ENGINE COMPARTMENT UPPER SOUND INSULATION SHIELD - R.R.

2.4 JTD 10V

Removing

See in Op. 1016A10

See in Op. 1048B44

1. Undo the fixing bolts.

2. Disconnect the EGR valve supply pipe from the connector on the throttle casing.

3. Disconnect the vacuum pipe from the vacuum unit.

4. Undo the bolts fixing the throttle casing to the intake manifold.

5. Remove pneumatically controlled throttle casing

PNEUMATICALLY CONTROLLED THROTTLE CASING - R.R.

Refitting

- Fit the throttle casing on the intake manifold.

- Tighten the bolts fixing the throttle casing to the intake manifold.

- Connect the vacuum pipe to the connector on the vacuum unit.

- Tighten the bolts fixing the EGR valve supply pipe to the throttle casing.

See in Op. 1048B44

See in Op. 1016A10

Parts & tools for this job Staging For 2002 Lancia Thesis

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.