Check on operation of supercharging pressure solenoid valve (pierburg)
- Make
- Alfa Romeo
- Model
- Brera and Spider Factory Service Manual
- Year
- 2005–2010
- Section
- Engine supercharging system › Check on operation of supercharging pressure solenoid valve (pierburg)
CHECK ON OPERATION OF SUPERCHARGING PRESSURE SOLENOID VALVE (PIERBURG)
| CHECK TO BE PERFORMED | RESOLUTION IF THE CHECK IS NOT OK | |
|---|---|---|
| 1 | Press the START/STOP button and turn off the engine. Disconnect the wiring harness connector from the turbine variable geometry solenoid. See L036 TURBINE VARIABLE GEOMETRY CONTROL SOLENOID VALVE Press the START/STOP button. Measure the voltage between Pin 1 of the solenoid wiring side connector and Earth. Ensure it is greater than 11V. See L036 TURBINE VARIABLE GEOMETRY CONTROL SOLENOID VALVE Press the START/STOP button. Move on to Step 4 | Move on to Step 2 |
| 2 | In the engine compartment junction unit, remove fuse F11 (third from the right in the lower row) Press the START/STOP button. Check the voltage between the fuse inlet contact and earth. Ensure it is greater than 11 V. | Replace the junction unit Op. 5505A13 ADDITIONAL JUNCTION UNIT IN ENGINE COMPARTMENT - R.R. |
| 3 | If fualts are present, repair or if necessary replace the electrical wiring between the engine compartment junction unit and the solenoid. See E5050 DIESEL ENGINES ELECTRONIC MANAGEMENT The test can be considered over | Replace the junction unit Op. 5505A13 ADDITIONAL JUNCTION UNIT IN ENGINE COMPARTMENT - R.R. |
| 4 | Disconnect the wiring harness connector from engine control unit connector B See M010 ENGINE MANAGEMENT ECU Press the START/STOP button. Measure the voltage between Pin 2 of the solenoid wiring side connector and Earth. Ensure it is less than 0.3 V. | Repair or if necessary replace the electrical wiring between the engine control unit and the solenoid |
| 5 | Press the START/STOP button. Measure the voltage between Pin 2 of the solenoid wiring side connector and Earth. Ensure it is greater than 500 kOhm. | Repair or if necessary replace the electrical wiring between the engine control unit and the solenoid |
| 6 | Measure the resistance between Pin 1 of the solenoid wiring side connector and Pin 7 of engine control unit wiring side connector. Ensure it is less than 5 Ohms. | Repair or if necessary replace the electrical wiring between the engine control unit and the solenoid |
| 7 | Reconnect the wiring harness connector to the engine control unit See M010 ENGINE MANAGEMENT ECU Connect a test bulb between pins 1 and 2 of the solenoid See L036 TURBINE VARIABLE GEOMETRY CONTROL SOLENOID VALVE Press the START/STOP button. Carry out the following active diagnosis: Turbo regulator, check that the bulb comes on. Move on to Step 9 | Move on to Step 8 |
| 8 | Reconnect the wiring harness connector to the solenoid See L036 TURBINE VARIABLE GEOMETRY CONTROL SOLENOID VALVE Replace the engine management control unit Op. 1060G80 DIESEL ELECTRONIC INJECTION CONTROL UNIT - .R The test can be considered over | |
| 9 | Replace the solenoid valve Op. 1064B42 SOLENOID CONTROLLING TURBOCHARGER VANE POSITION ACTUATOR - R.R |
Parts & tools for this job Staging For 2005 Alfa Romeo Brera
- PARTEngine gasket setSearch: Alfa Romeo Brera 2005 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.