Workshop Manuals Factory service & repair Alfa Romeo
01 General information02 Specifications03 Manufacturing data and tolerances04 Tightening torques05 Fluids and lubricants06 Maintenance07 Diagnostic checks08 Engine09 Clutch10 Gearbox and differential11 Axles and driveshafts12 Brakes13 Steering14 Suspension and wheels15 Heating, air conditioning and auxiliary units16 Electrical equipment17 Body fittings18 Body panels and frame19 Wiring diagrams and electrical functions20 Wiring harnesses21 Connectors and pin-outs22 Fault diagnosis23 Special tools
Alfa Romeo GT Factory Service Manual (2003-2010)15 · Heating, air conditioning and auxiliary units
15 · Heating & A/C

Introduction - auxiliary units

Make
Alfa Romeo
Model
GT Factory Service Manual
Year
2003–2010
Section
General › Introduction - auxiliary units
Heating, air conditioning and auxiliary unitsIntroduction - auxiliary units

INTRODUCTION - AUXILIARY UNITS

2.0 JTS, 3.2 V6, 1.9 JTD 16V

WARNINGS

Use care when working on trim components and use the specified tools correctly in order to avoid damage.

PRECAUTIONS

Before working on the electrical system (connectors, electrical components, wiring, etc.) turn the ignition off (STOP) and DISCONNECT THE BATTERY.

Each time the battery terminal leads are disconnected, the (right and left) electric windows control unit initialization procedure must be carried out to programme the door window end of travel, refer to

Op. 7005M40 FRONT ELECTRIC WINDOW SYSTEM ECU - R+R FOLLOWING ELECTRICAL WIRING CHECK

Parts & tools for this job Staging For 2003 Alfa Romeo GT

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.