Workshop Manuals Factory service & repair Alfa Romeo
01 General information02 Specifications03 Manufacturing data and tolerances04 Tightening torques05 Fluids and lubricants06 Maintenance07 Diagnostic checks08 Engine09 Clutch10 Gearbox and differential11 Transmission (4x4)12 Axles and driveshafts13 Brakes14 Steering15 Suspension and wheels16 Heating, air conditioning and auxiliary units17 Electrical equipment18 Body fittings19 Body panels and frame20 Wiring diagrams and electrical functions21 Wiring harnesses22 Connectors and pin-outs23 Fault diagnosis24 Special tools
Alfa Romeo Brera and Spider Factory Service Manual (2005-2010)17 · Electrical equipment
17 · Electrical

Battery support/drip tray - r.r

Make
Alfa Romeo
Model
Brera and Spider Factory Service Manual
Year
2005–2010
Section
Current generation › Battery support/drip tray - r.r
Electrical equipmentBattery support/drip tray - r.r

BATTERY SUPPORT/DRIP TRAY - R.R

Operation 5530B52 · BATTERY AND LEADS

Removing

Op. 5530B10 BATTERY - R+R

1. Cut the electrical wiring retaining bands.

2. Undo the bolts.

3. Remove the battery drip tray.

BATTERY SUPPORT/DRIP TRAY - R.R

Refitting

- Check that the battery drip tray is not damaged.

- Place the battery drip tray in its housing.

- Tighten the bolts.

ComponentFasteningdiaValue (daNm)Validity
BATTERY DRIP TRAYBoltM8x221.9 ÷ 2.9

- Fit the retaining bands on the wiring.

Parts & tools for this job Staging For 2005 Alfa Romeo Brera

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.